Publication date: 15 February 2018
Source:Journal of Hazardous Materials, Volume 344
Author(s): Dongxing Xuan, Chi Sun Poon
In order to reduce the leaching of pollutants and remove the Al and Zn/Al alloy from municipal solid waste incineration bottom ash (MSWIBA), an optimized alkaline pre-treatment procedure was developed in this study. The influences of alkaline conditions on the removal rate of Al and Zn/Al alloy were investigated, including [OH]− concentration, temperature, particle size, liquid/solid ratio and treatment duration. The experimental results showed that the optimized alkaline pre-treatment conditions to efficiently remove the Al and Zn/Al alloy was by using a minimum of 1.0mol/l [OH]−, at 55°C and with a minimal liquid/solid ratio of 5. The removal rate of Al and Zn/Al alloy followed an S-shape curve, in which the slow beginning stage was attributed to the protection of the oxidation layer and the quenched product around the Al and Al/Zn alloy. After 3h of the optimized alkaline pre-treatment, the leaching of Cr, Cu, Pb and Zn of the treated MSWIBA was reduced by more than 90% of that of the original MSWIBA. The alkali-silica reaction test further indicated that the expansion of concrete prepared with the pre-treated MSWIBA was significantly reduced and there was no macro-crack or spalling damage on the surface of the tested specimens.
Graphical abstract
http://ift.tt/2hDNwwT
Δεν υπάρχουν σχόλια:
Δημοσίευση σχολίου